Chilled Water System Upgrades

This project has been carried out in several stages and has involved both the AHU and Process Chilled water systems at local pharmaceutical plant.
Both systems have had low loss headers added and all pumps replaced with more efficient variable speed units. New Trend BMS outstations have enabled the systems to be turned down or even shut off during low use periods.
New, more efficient chillers were also supplied and installed on both systems. This has led to very considerable energy saving for the client as well as improved capacity and reliability.