ECS Take the Data Centre Highway

ECS has successfully completed yet another generator control system at a large Data Centre in Slough.  The project required our IPAF trained engineers to install high level cable containment using access MEWPs between the four newly positioned CAT generators and the buildings main intake boards.  This also included the battery tripping units and high voltage intertripping panels.  Multi core cables were then installed, glanded and terminated.  As with all of our installations every cable and every cable core is uniquely identified which makes commissioning, future maintenance and tracing more efficient saving time and money.  It is this attention to detail and our work quality that has won us praise from several generator companies who we continue to work closely with.

 

This is the second Data Centre project completed for our client.  It was completed on time and within a limited time scale including the submission of all testing documentation.  The Data Centre is due to be up and running next month and we look forward to working with our client again in the future.